Page 25 - Annual Report 2014
P. 25
ANNUAL REPORT 2014

The top 100 candidates from FEAST were invited in English for operational ATCOs, EUROCONTROL
to preliminary interview in Ankara in November has developed English Language Proficiency for
2014 where four preliminary interview boards sat Aeronautical Communication (ELPAC) test. Seven air
simultaneously. A total of 50 candidates progressed traffic control personnel from DHMI have participated
to the final interview board. at ELPAC workshop and been accredited as ELPAC
testing personnel.
To meet ICAO language proficiency requirements

TRAINING centre has theoretical training classrooms,
laboratories, radar simulator, tower simulator with
Training means investing in the future. Once again 3-dimensional and 360 degree monitoring features
this year, despite the heavy workload, the DHMI kept and pilot control units. The Air Traffic Control
up this principle and managed to ensure high-quality Simulator System is consists of tower and approach/
training for all of its trainees. en-route control units. The system has the capability
of running stand-alone as a tower or radar simulator
The Basic Training for ATCO trainees was conducted or in integrated mode which same scenario can run
at the Training Centre of DHMI, located in Esenbo─ča
Airport, DHMI conducts basic, refreshment and
advanced ATC training programmes. The training

23
   20   21   22   23   24   25   26   27   28   29   30